1. The meter should be installed in horizontal position with the register face upwards
2. Pipeline must be flushed before installation
3. The meter should be constantly full of water during operation
Measuring the volume of cold potable water passing through the pipeline
Working Conditions
1. Water temperature: ≤ 40°
2. Water pressure: ≤ 1.6Mpa
Main technical data:
Error curve:
a.at low zone is ±5%from Qmin to Qt(not contaim boundary)
b.at high zone is ±2%from transitional flow (Qt)to maximum low(Qmax)








